Belgium · electricity price and wind power
Wallonia day-ahead wind power forecast
Choose a forecast
Tomorrow · Wed 28 Oct, 11:00 Brussels
Wind power forecast for Wednesday 28 October 2026
62MW
3.7% of 1,672 MW installed
- Elia, same hour
- 97 MW
- Metered
- not yet
- 80% interval
- 22 to 136 MW
Most recent scored day, Tue 27 Oct
Metered 709 MW. OpenWindCast 733 MW, off by 1.5% of capacity; Elia 730 MW, off by 1.3%. Elia closer
Scoreboard against Elia
Live since 4 Jul 2026 · 116 scored days · 4 Jul to 27 Oct
0% higher error than Elia's own day-ahead forecast
OpenWind
2.83%
of capacity
Elia
2.83%
of capacity
Closer on
50%
of days
Error is the average miss at the 11:00 target, as a share of installed capacity (nMAE). Back-test before go-live, shown apart: 283 days, 20% lower error than Elia. Only live days count above.
Forecast against the operator and the metered output
One point per day at 11:00, in MW. The shaded area is what the fleet actually produced; before the Live marker the forecast line is the back-test.
Accuracy by type of day
Live record, split by how windy the day turned out. Average error in % of capacity; further left is better.
| Type of day | Days | OpenWindCast | Elia | Closer on |
|---|---|---|---|---|
| Low-wind days below 15% of capacity | 85 | 1.61% | 1.97% | 56% |
| Moderate days 15% to 35% of capacity | 17 | 4.90% | 4.14% | 35% |
| High-wind days above 35% of capacity | 14 | 7.75% | 6.44% | 29% |
The daily record
One row per day at 11:00, in MW. Misses are in % of capacity. Losing days stay in the record.
| Day (11:00) | OpenWindCast | Elia | Metered | Our miss | Elia miss | Closer |
|---|---|---|---|---|---|---|
| Wed 28 Oct | 62 | 97 | not yet | – | – | pending |
| Tue 27 Oct | 733 | 730 | 709 | 1.5% | 1.3% | Elia |
| Mon 26 Oct | 367 | 444 | 382 | 0.9% | 3.7% | OpenWindCast |
| Sun 25 Oct | 963 | 1,022 | 893 | 4.2% | 7.7% | OpenWindCast |
| Sat 24 Oct | 515 | 685 | 567 | 3.1% | 7.0% | OpenWindCast |
| Fri 23 Oct | 1,091 | 1,231 | 1,248 | 9.4% | 1.1% | Elia |
| Thu 22 Oct | 1,075 | 1,110 | 1,058 | 1.0% | 3.1% | OpenWindCast |
| Wed 21 Oct | 724 | 599 | 874 | 9.0% | 16.4% | OpenWindCast |
| Tue 20 Oct | 234 | 275 | 244 | 0.6% | 1.8% | OpenWindCast |
| Mon 19 Oct | 60 | 65 | 113 | 3.2% | 2.9% | Elia |
| Sun 18 Oct | 34 | 77 | 35 | 0.1% | 2.5% | OpenWindCast |
| Sat 17 Oct | 252 | 291 | 302 | 3.0% | 0.7% | Elia |
| Fri 16 Oct | 191 | 169 | 170 | 1.3% | 0.0% | Elia |
| Thu 15 Oct | 147 | 188 | 137 | 0.6% | 3.1% | OpenWindCast |
Elia's forecast is captured at issue and held fixed. Operators refine their forecasts nearer to delivery, so a value published later may differ. The most recent day or two settle once measured generation is published.
Forecasting wind in Wallonia
Wallonia is the southern region of Belgium, with most turbines across the provinces of Hainaut, Namur and Liège. The forecast covers Walloon onshore wind and is scored against Elia's published day-ahead forecast.
Walloon wind sits higher and more thinly spread than its Flemish neighbour, on the plateaux of Hainaut and Namur and rising eastward towards the Ardennes. The elevation brings a better wind resource along with a rougher and more varied surface, and the fleet is arranged in small scattered clusters rather than dense corridors. Two regions of one small country, an hour apart, therefore present noticeably different forecasting problems.
The benchmark
The benchmark is Elia's own day-ahead forecast for Walloon onshore wind, from Elia Open Data, covering both the distribution-connected and the Elia-grid-connected fleet. As in Flanders, Elia publishes early enough that the benchmark is captured at the time the forecast is issued.
What is published for Wallonia
One value per day: onshore wind output at 11:00 local time tomorrow, as a load factor and in megawatts. Once Elia's own forecast for that day is published it is captured and held fixed, and once the metered output is settled both forecasts are scored against it. Every day is added to the record above and nothing is removed or rewritten later. How this is measured.
Questions about wind in Wallonia
How does Wallonia differ from Flanders?
Wallonia is higher and more dispersed, on the plateaux of Hainaut and Namur rising towards the Ardennes, while Flanders is flat, dense and closer to the coast. Elia forecasts and publishes the two separately. The electricity price is not split that way, because Belgium is a single bidding zone.
What does 'monitored capacity' mean?
It is the onshore capacity Elia tracks and forecasts for Wallonia, which is the basis the benchmark is built on, so the forecast, the benchmark and the outcome all sit on the same fleet.
Official links for Wallonia
Grid operators, their published data, the power exchange and the European transparency platform.
Other bidding zones
- Germany
- Spain
- Great Britain
- Italy
- Poland
- Finland
- France
- Ireland
- Portugal
- Greece
- Austria
- Denmark DK1
- Flanders
- Denmark DK2
Compare every operator: how accurate are European TSO wind power forecasts? · How the scoring works