OpenWindCast

Spain · electricity price and wind power

Spain day-ahead wind power forecast

Choose a forecast

Record updated 27 Oct 2026 Scored against REE

Tomorrow · Wed 28 Oct, 11:00 Madrid

Wind power forecast for Wednesday 28 October 2026

3,518MW

10.8% of 32,451 MW installed

REE, same hour
published later
Metered
not yet
80% interval
2,473 to 5,001 MW

Most recent scored day, Tue 27 Oct

Metered 1,266 MW. OpenWindCast 1,412 MW, off by 0.4% of capacity; REE 1,762 MW, off by 1.5%. OpenWindCast closer

Scoreboard against REE

Live since 20 Jun 2026 · 127 scored days · 20 Jun to 27 Oct

0% lower error than REE's own day-ahead forecast

OpenWindCast

1.75%

of capacity

REE

1.75%

of capacity

Closer on

46%

of days

Error is the average miss at the 11:00 target, as a share of installed capacity (nMAE). Back-test before go-live, shown apart: 259 days, 45% lower error than REE. Only live days count above.

Forecast against the operator and the metered output

One point per day at 11:00, in MW. The shaded area is what the fleet actually produced; before the Live marker the forecast line is the back-test.

Accuracy by type of day

Live record, split by how windy the day turned out. Average error in % of capacity; further left is better.

OpenWindCast REE
0%1%2%3%4%Low-wind days (108 days)Moderate days (19 days)0%2%4%Low-windModerate
Type of dayDaysOpenWindCastREECloser on
Low-wind days below 15% of capacity1081.41%1.66%49%
Moderate days 15% to 35% of capacity193.70%2.28%26%

The daily record

One row per day at 11:00, in MW. Misses are in % of capacity. Losing days stay in the record.

JSON
Day (11:00) OpenWindCast REE Metered Our miss REE miss Closer
Wed 28 Oct 3,518 – not yet – – pending
Tue 27 Oct 1,412 1,762 1,266 0.4% 1.5% OpenWindCast
Sun 25 Oct 5,958 5,991 5,377 1.8% 1.9% OpenWindCast
Sat 24 Oct 2,921 2,801 2,947 0.1% 0.5% OpenWindCast
Fri 23 Oct 7,402 8,596 8,999 4.9% 1.2% REE
Thu 22 Oct 3,047 3,631 3,037 0.0% 1.8% OpenWindCast
Wed 21 Oct 7,136 6,188 6,270 2.7% 0.3% REE
Tue 20 Oct 3,459 4,793 3,852 1.2% 2.9% OpenWindCast
Mon 19 Oct 6,276 4,329 4,871 4.3% 1.7% REE
Sun 18 Oct 12,218 11,089 10,459 5.4% 1.9% REE
Sat 17 Oct 8,791 7,652 7,973 2.5% 1.0% REE
Fri 16 Oct 879 691 451 1.3% 0.7% REE
Thu 15 Oct 1,775 1,937 1,736 0.1% 0.6% OpenWindCast
Wed 14 Oct 1,678 1,866 1,957 0.9% 0.3% REE

REE's forecast is captured on the day it is published and held fixed. Operators refine their forecasts nearer to delivery, so a value published later may differ. The most recent day or two settle once measured generation is published.

Forecasting wind in Spain

Spain operates one of the largest onshore wind fleets in the world, concentrated in Castilla y León, Galicia and Aragón. The forecast covers Spanish onshore wind and is scored against the day-ahead forecast Red Eléctrica publishes through the ENTSO-E Transparency Platform.

The Spanish fleet is concentrated in Castilla y León, Galicia, Aragón and Andalusia, and a great deal of it sits on ridges and elevated ground rather than open plain. Terrain of that kind is the classic difficulty in wind forecasting. A weather model works on a grid several kilometres wide and reports an average wind for each cell, while a turbine on a ridge crest inside that cell experiences something quite different, because the ridge accelerates the flow in a way the grid cannot represent. The effect is a limit shared by everyone forecasting the zone.

The benchmark

The benchmark is Red Eléctrica de España's own day-ahead wind forecast for the Spanish bidding zone, published through the ENTSO-E Transparency Platform and captured on the day it appears. Metered generation and installed capacity come from the same source, so the forecast, the benchmark and the outcome all sit on one consistent basis.

What is published for Spain

One value per day: onshore wind output at 11:00 local time tomorrow, as a load factor and in megawatts. Once REE's own forecast for that day is published it is captured and held fixed, and once the metered output is settled both forecasts are scored against it. Every day is added to the record above and nothing is removed or rewritten later. How this is measured.

Questions about wind in Spain

Why measure error against installed capacity rather than actual output?

Because a percentage of actual output becomes unstable on calm days. A 50 MW miss against a 200 MW hour looks catastrophic and the same 50 MW miss against a 20 GW hour looks trivial, even though the two cost a market participant roughly the same. Normalising by installed capacity keeps every day on one scale, and it is the convention grid operators use.

Does the Spanish forecast cover the islands?

No. It covers the peninsular Spanish bidding zone, which is what Red Eléctrica forecasts and settles against. The Canary and Balearic systems are separate.

Grid operators, their published data, the power exchange and the European transparency platform.

Other bidding zones

Compare every operator: how accurate are European TSO wind power forecasts? · How the scoring works